Forum Index : Windmills : I’m back!

Author Message
Gizmo

Admin Group

Joined: 05/06/2004
Location: Australia
Posts: 5078
Posted: 09:44am 04 Aug 2006
Copy link to clipboard 
Print this post

Well that was a great trip, short but eventfull. I managed to visit the Ropatec windmill at Townsville, and the Stanwell windfarm at Windy Hill near Ravenshoe.
The winds were only mild at Windy Hill, 5ms, but enough to run the windmills.



I also spent time in Innisvale, Cairns and Atherton, and visited the local tourist hot spots, national parks and the train ride up to Kuranda and cable car back down to Cairns. All I can say is its a beautifull part of Australia, I can see why its so popular with the international tourists. Innisvale is getting back up on its feet after the cyclone early this year, but the damage is still very visible for 50 km north and south of the center, the trees look like someone ripped all the branches off. All thats left is the trunk, now covered in new growth.
I'll write up a story in the next week or two and post heaps of pictures.

Glenn
The best time to plant a tree was twenty years ago, the second best time is right now.
JAQ
 
makourain

Senior Member

Joined: 19/04/2006
Location:
Posts: 111
Posted: 10:51pm 04 Aug 2006
Copy link to clipboard 
Print this post

[quote]The winds were only mild at Windy Hill, 5ms, but enough to run the windmills.[/quote]

how much is that in kmp/h?

nice pics
 
Xcat
Newbie

Joined: 13/07/2006
Location: Australia
Posts: 6
Posted: 11:26pm 04 Aug 2006
Copy link to clipboard 
Print this post

5*3600/1000=18Km/h
Xcat
Brisbane QZ
 
amortiser
Newbie

Joined: 03/09/2017
Location: Australia
Posts: 2
Posted: 03:15am 03 Sep 2017
Copy link to clipboard 
Print this post

In your report on the Windy Hill wind farm you stated that in July 2006 that the wind farm generated 162.75 gigawatts of power.

The Windy Hill wind farm has a registered generating capacity of 12 mwh. If it was operating at full capacity in July it would generate 12x24x31 or 8,982 mwh or 8.982 gigawatts.

How did you arrive at a figure of 162.75 gigawatts for the month? That would be impossible. Wind farms in Australia are operating between 30-35% of their registered capacity. If this was the production rate at Windy Hill it would be of the order of 3.125 gigawatts - a long way short of that stated in your report. It would take over 4 years at that capacity factor for Windy Hill to generate 162.75 gigawatts.
 
flc1
Senior Member

Joined: 20/11/2011
Location: New Zealand
Posts: 242
Posted: 09:28pm 03 Sep 2017
Copy link to clipboard 
Print this post

cool pics Glenn.Edited by flc1 2017-09-05
 
Boppa
Guru

Joined: 08/11/2016
Location: Australia
Posts: 814
Posted: 02:56am 04 Sep 2017
Copy link to clipboard 
Print this post

amortiser
I suspect from the figures that Windy Hill had produced 162.75 GW of power since their installation in 2000 (ie 162.75GW BY july 2006, not IN july 2006...
look at the figures
"It would take over 4 years at that capacity factor for Windy Hill to generate 162.75 gigawatts." built in 2000, by july 2006 (6 years later) it had produced that figure
So its slightly under the quoted 30-35% of registered capacity....
 
Gizmo

Admin Group

Joined: 05/06/2004
Location: Australia
Posts: 5078
Posted: 08:12pm 04 Sep 2017
Copy link to clipboard 
Print this post

Yeah Boppa you're right, it was total generated from day one, not for the month. I'll reword that article from

"Last month ( July 2006 ) the windfarm generated 162.75 Gigga Watt Hrs of electricity, with a saving of approx 164,500 Tons of CO2 Gas."

to

"Up to July 2006 the windfarm generated 162.75 Gigga Watt Hrs of electricity, with a saving of approx 164,500 Tons of CO2 Gas."

Of more interest is amortiser signed up as a new member to correct ( incorrectly ) a 11 year old article ??!!

Glenn
The best time to plant a tree was twenty years ago, the second best time is right now.
JAQ
 
Boppa
Guru

Joined: 08/11/2016
Location: Australia
Posts: 814
Posted: 03:06am 05 Sep 2017
Copy link to clipboard 
Print this post

hadnt even noticed that!

I think thats the longest thread necro I have ever seen
 
amortiser
Newbie

Joined: 03/09/2017
Location: Australia
Posts: 2
Posted: 12:12pm 11 Sep 2017
Copy link to clipboard 
Print this post

I joined after looking for information on the operations of the Ravenshoe Wind Farm. This site

android.id/energy/wind-energy

gives information on wind energy production in Australia in real time. Windy Hill wind farm is listed as an installation in Queensland but it has not shown any power production on its updates since I started looking at in a couple of months ago. I was curious as to why and found this site and this post when I went looking.

At a CF of 12mwh this farm since commissioning in August 2000 would have generated 612.08 gigawatts. With total generation for the period since commissioning to when the site was visited at 162.75 gigawatts it has operated at about 26.6% capacity, well below the average for wind farms in the south.
 