Author Message
PhenixRising
Guru

Joined: 07/11/2023
Location: United Kingdom
Posts: 2100
Posted: 03:23pm 20 Aug 2025
Copy link to clipboard 
Print this post

Not an RPi user myself but I know that some of us are.

Github link
 
Amnesie
Guru

Joined: 30/06/2020
Location: Germany
Posts: 763
Posted: 06:26pm 20 Aug 2025
Copy link to clipboard 
Print this post

Imagine MMBASIC running on a Raspberry Pi 5 with all its features and the power of the RaspberryPi 5 ... this would be insane  
 
JohnS
Guru

Joined: 18/11/2011
Location: United Kingdom
Posts: 4391
Posted: 09:00pm 20 Aug 2025
Copy link to clipboard 
Print this post

  Amnesie said  Imagine MMBASIC running on a Raspberry Pi 5 with all its features and the power of the RaspberryPi 5 ... this would be insane  

"Just" needs someone willing to take over the Picromite code... (or to extend MMB4L).

Whether the RPi 5 is the best CPU is debatable.

John
 
PhenixRising
Guru

Joined: 07/11/2023
Location: United Kingdom
Posts: 2100
Posted: 09:12pm 20 Aug 2025
Copy link to clipboard 
Print this post

For me, RPi 5, Android device, Windows, Linux would all be HMIs.

Kinda attracted to MMB4W or MMB4A right now with PicoMites and ArmMite H7s handling the actual controlling.

Odroid product is looking a bit good
 
lizby
Guru

Joined: 17/05/2016
Location: United States
Posts: 3885
Posted: 09:19pm 20 Aug 2025
Copy link to clipboard 
Print this post

  Quote  PiGPIO for RPi5


Now, from the point of view of the C code for the long-ago PiCroMite ( https://www.thebackshed.com/forum/ViewTopic.php?FID=16&TID=13219  ), is this the same PiGPIO? Peter stopped supporting that because Raspberry Pi kept breaking his code by changing things under the hood.

Would it compile (even if missing all the features added since 2020)?
PicoMite, Armmite F4, SensorKits, MMBasic Hardware, Games, etc. on FOTS
 
PhenixRising
Guru

Joined: 07/11/2023
Location: United Kingdom
Posts: 2100
Posted: 09:22pm 20 Aug 2025
Copy link to clipboard 
Print this post

For someone elsewhere, I just had to prove that my S-Curve acceleration routine did in fact work, by generating a plot.
Look at any other solution out there because I haven't found one that isn't horrendously complicated  









I know how to do this on the PC using SmallBASIC and so that's what I used.

Basic just totally rocks, I don't care about this "non standard" talk because modifications are usually trivial.
 
PhenixRising
Guru

Joined: 07/11/2023
Location: United Kingdom
Posts: 2100
Posted: 09:26pm 20 Aug 2025
Copy link to clipboard 
Print this post

  lizby said  
  Quote  PiGPIO for RPi5


Now, from the point of view of the C code for the long-ago PiCroMite ( https://www.thebackshed.com/forum/ViewTopic.php?FID=16&TID=13219  ), is this the same PiGPIO? Peter stopped supporting that because Raspberry Pi kept breaking his code by changing things under the hood.

Would it compile (even if missing all the features added since 2020)?


The SmallBasic guys had a warning that their PiGPIO was only compatible with up to RPi-4 and they weren't sure whether they would get around to RPi-5 but apparently they have done.
 
JohnS
Guru

Joined: 18/11/2011
Location: United Kingdom
Posts: 4391
Posted: 09:38pm 20 Aug 2025
Copy link to clipboard 
Print this post

  lizby said  
  Quote  PiGPIO for RPi5


Now, from the point of view of the C code for the long-ago PiCroMite ( https://www.thebackshed.com/forum/ViewTopic.php?FID=16&TID=13219  ), is this the same PiGPIO?

I expect it is (well a newer version).

  lizby said  Peter stopped supporting that because Raspberry Pi kept breaking his code by changing things under the hood.

They do that with the Pico / SDK, too.  It's often avoidable but people just break things anyway, sadly.

  lizby said  Would it compile (even if missing all the features added since 2020)?

With some effort, probably.

I think we're short of a volunteer, though.

John
 
matherp
Guru

Joined: 11/12/2012
Location: United Kingdom
Posts: 12058
Posted: 08:20am 21 Aug 2025
Copy link to clipboard 
Print this post

PIGPIO hasn't been updated in 4 years. This doesn't use PIGPIO but Linux IOCTL calls.
 
lizby
Guru

Joined: 17/05/2016
Location: United States
Posts: 3885
Posted: 12:02pm 21 Aug 2025
Copy link to clipboard 
Print this post

  matherp said  PIGPIO hasn't been updated in 4 years. This doesn't use PIGPIO but Linux IOCTL calls.


I asked Google Gemini to "Compare Linux IOCTL calls and libgpiod".

This gets to the core of modern GPIO interaction in Linux. Comparing raw ioctl calls and libgpiod is like comparing assembling a car from individual parts versus driving a fully manufactured car. Both achieve the goal of "transportation," but the experience, safety, and features are vastly different.

In short, libgpiod is the modern, recommended, and vastly superior way for user-space applications to interact with GPIOs. The raw ioctl interface is the low-level kernel mechanism that libgpiod uses under the hood.

Here is a detailed comparison:




Why would anyone use IOCTL now?
PicoMite, Armmite F4, SensorKits, MMBasic Hardware, Games, etc. on FOTS
 
robert.rozee
Guru

Joined: 31/12/2012
Location: New Zealand
Posts: 2552
Posted: 03:18pm 21 Aug 2025
Copy link to clipboard 
Print this post

  lizby said  
  matherp said  PIGPIO hasn't been updated in 4 years. This doesn't use PIGPIO but Linux IOCTL calls.

[...]
Why would anyone use IOCTL now?


an old saying:
the only problem that can not be solved by adding a[nother] layer of abstraction, is the problem of too many layers of abstraction

each additional layer of abstraction (1) adds overall complexity, (2) consumes additional computing power, and (3) increases memory requirements. while it is certainly true that a carefully designed layer of abstraction may simplify the high-level programmer's job in some circumstances, in other circumstances it can do quite the opposite.

where appropriate i use IOCTL calls myself, to good effect.

in the case of the RPi the question is one of: how standardized are the I/O IOCTL calls vs how standardized are the PIGPIO calls? bearing in mind that, in theory, all I/O access goes via an interface with the binary "blob" - itself presenting a layer of abstraction. as Peter has noted variously in the past, PIGPIO for the RPi has presented him with a 'moving target' that continuously morphs to the extent of yielding an unmaintainable project. is IOCTL any better in the RPi case - who knows?


cheers,
rob   :-)
 
lizby
Guru

Joined: 17/05/2016
Location: United States
Posts: 3885
Posted: 04:20pm 21 Aug 2025
Copy link to clipboard 
Print this post

  robert.rozee said  each additional layer of abstraction (1) adds overall complexity, (2) consumes additional computing power, and (3) increases memory requirements


In my experience as a programmer (since 1970), (1) is usually not true--abstraction behind the scenes (by others) simplifies the programs that I write, and Moore's law has made (2) and (3) fundamentally irrelevant in the vast majority of cases.

In the particular case of Linux running on current devices (even tiny ones), it's not likely often to be the case that computing power or memory requirements constrain one to use IOCTL rather than libgpiod (when available).

Concerning availability, the most up-to-date libgpiod is not available for installation on Raspberry pi using apt, but you can easily download and compile it. The next release of Raspbian (perhaps later this year) is expected to have the latest (later?) version of libgpiod, which is included in Debian 13 (officially released August 9).
PicoMite, Armmite F4, SensorKits, MMBasic Hardware, Games, etc. on FOTS
 
Mixtel90

Guru

Joined: 05/10/2019
Location: United Kingdom
Posts: 9238
Posted: 06:21pm 21 Aug 2025
Copy link to clipboard 
Print this post

And the later version will break what?
If not that one then the next?
The lowest level call to the hardware is always the most reliable, even if it's more complex.

Then they change the hardware and it al goes round again as a new version is needed.

Computers are nasty evil things that, as a programmer, you have to cajole, tempt and sometimes even bully into doing what you want. :)

.
Edited 2025-08-22 04:22 by Mixtel90
Mick

Zilog Inside! nascom.info for Nascom & Gemini
 
robert.rozee
Guru

Joined: 31/12/2012
Location: New Zealand
Posts: 2552
Posted: 08:12pm 21 Aug 2025
Copy link to clipboard 
Print this post

  lizby said  
  robert.rozee said  each additional layer of abstraction (1) adds overall complexity, (2) consumes additional computing power, and (3) increases memory requirements


In my experience as a programmer (since 1970), (1) is usually not true--abstraction behind the scenes (by others) simplifies the programs that I write, and [...]


every layer of abstraction added, by definition, extends the 'path of execution' - ie, the CPU executes more instructions in order to achieve the same end result. execution of more instructions adds to the complexity; there is no free pass for code running "behind the scenes", it is still run irrespective of who wrote it.


cheers,
rob   :-)
 
lizby
Guru

Joined: 17/05/2016
Location: United States
Posts: 3885
Posted: 08:27pm 21 Aug 2025
Copy link to clipboard 
Print this post

  robert.rozee said  there is no free pass for code running "behind the scenes", it is still run irrespective of who wrote it


This is certainly true, but if the practical consequence for the user is undetectable, how does it matter?

If a user presses a button on a screen to turn on a pin and it takes a millisecond longer if libgpiod has been used compared to IOCTL, it's not likely to make a difference. If it could make a difference, the non-deterministic timing of the Raspberry Pi would probably make it a poor choice for the application.
PicoMite, Armmite F4, SensorKits, MMBasic Hardware, Games, etc. on FOTS
 
JohnS
Guru

Joined: 18/11/2011
Location: United Kingdom
Posts: 4391
Posted: 07:31am 22 Aug 2025
Copy link to clipboard 
Print this post

Might be better to focus on why PIGPIO was useful / better than the alternatives (sysfs / libgpiod / ...) and what MMBasic needs (or needed for Picromite).

There's also the issue of which libs to use and how stable their APIs are (if at all - it's as if this is nowadays forgotten [cf DLL hell]).

John
 
Mixtel90

Guru

Joined: 05/10/2019
Location: United Kingdom
Posts: 9238
Posted: 08:19am 22 Aug 2025
Copy link to clipboard 
Print this post

Any abstraction layer is reliant on any layers beneath it remaining stable. The problem with the Raspberry Pi is that the hardware changes drastically and that's a binary blob - there is no access to it as it's the subject of a NDA. To keep up with any changes you have to be Raspberry Pi or change your mode of access immediately they make changes to their API. That's ok for an official Raspberry Pi developer but almost impossible for anyone else.

IMHO the Raspberry Pi module is excellent for Raspberry Pi software and firmware but not much cop for anything else. The Pico is a far better platform in many ways as the hardware has been made more accessible.
Mick

Zilog Inside! nascom.info for Nascom & Gemini
 
thwill

Guru

Joined: 16/09/2019
Location: United Kingdom
Posts: 4405
Posted: 08:40am 22 Aug 2025
Copy link to clipboard 
Print this post

IMO this isn't a hardware or a software problem, it is a human problem, someone needs to have the time and inclination to do it AND the time and inclination to maintain it. The latter is more of a problem for a "real" computer than for a uC because by their very nature modern consumer computers are less-stable ecosystems.

Not very helpful I know, but I was unable to refrain from commenting for any longer .

Best wishes,

Tom
Edited 2025-08-22 18:43 by thwill
MMBasic for Linux, Game*Mite, CMM2 Welcome Tape, Creaky old text adventures
 
matherp
Guru

Joined: 11/12/2012
Location: United Kingdom
Posts: 12058
Posted: 08:53am 22 Aug 2025
Copy link to clipboard 
Print this post

The point about PIGPIO was that it integrated access to all standard I/O functions on the Pi.
libgpiod only deals with GPIO lines (digital input/output pins).

ChatGPT:
  Quote  It does not support higher-level peripheral buses or functions like:

SPI (Serial Peripheral Interface)

I²C (Inter-Integrated Circuit)

PWM (Pulse Width Modulation)

Those are handled through different Linux kernel subsystems and userspace APIs:

🔹 How these are handled in Linux

GPIO → via the GPIO character device API → libgpiod

I²C → via /dev/i2c-* nodes and the i2c-dev userspace interface (i2c-tools, libi2c)

SPI → via /dev/spidev* nodes and the spidev userspace driver (spidev.h)

PWM → via the PWM sysfs interface (or newer character device APIs in development)

UART/Serial → via /dev/ttyS* or /dev/serial*

So if you need to talk to, say, an I²C sensor:

Use i2c-tools (i2cdetect, i2cget, i2cset) or the i2c-dev API in C.

For SPI devices:

Use /dev/spidevN.M with ioctl()s from <linux/spi/spidev.h>.

For PWM:

On most kernels, expose controls under /sys/class/pwm/.

Some boards have pwmchipN character devices too.

Taken together, this means developing and maintaining anything remotely like the PicoMite environment on a Linux platform is a massive undertaking. Unless and until Linux implements a complete I/O framework I think it is a non-starter.
 